STIGViewer Support

The PE router must be configured to enforce the split-horizon rule for all pseudowires within a Virtual Private LAN Services (VPLS) bridge domain.

Overview

Finding IDVersionRule IDIA ControlsSeverity
V-207181SRG-NET-000512-RTR-000010SV-207181r604135_ruleCCI-000366low
Description
A virtual forwarding instance (VFI) must be created on each participating PE router for each customer VLAN using VPLS for carrier Ethernet services. The VFI specifies the VPN ID of a VPLS domain, the addresses of other PE routers in the domain, and the type of tunnel signaling and encapsulation mechanism for each peer PE router. The set of VFIs formed by the interconnection of the emulated VCs is called a VPLS instance, which forms the logic bridge over the MPLS core network. The PE routers use the VFI with a unique VPN ID to establish a full mesh of emulated virtual circuits or pseudowires to all the other PE routers in the VPLS instance. The full-mesh configuration allows the PE router to maintain a single broadcast domain. With a full-mesh configuration, signaling and packet replication requirements for each provisioned virtual circuit on a PE can be high. To avoid the problem of a packet looping in the provider core, thereby adding more overhead, the PE devices must enforce a split-horizon principle for the emulated virtual circuits; that is, if a packet is received on an emulated virtual circuit, it is not forwarded on any other virtual circuit.
STIGDate
Router Security Requirements Guide2025-09-10

Related Frameworks

1 mapping across 5 frameworks
SCF0 mappings

No source states a mapping between these directly.

Also reachable in 3 hops (8) derived by us, not asserted by any source

Each of these is a route we composed by chaining published mappings. No publisher states a relationship between the two endpoints.

CFG-01Configuration Management Program
1.00
END-01Endpoint Device Management (EDM)
1.00
END-04Malicious Code Protection (Anti-Malware)
1.00
END-06Endpoint File Integrity Monitoring (FIM)
1.00
MON-01Continuous Monitoring
1.00
MON-01.7File Integrity Monitoring (FIM)
1.00
CFG-02Secure Baseline Configurations
0.50
CFG-02.7Approved Configuration Deviations
0.50
NIST 800-530 mappings

No source states a mapping between these directly.

Also reachable in 2 hops (100) derived by us, not asserted by any source

Each of these is a route we composed by chaining published mappings. No publisher states a relationship between the two endpoints.

AC-12Session Termination
1.00
AC-16(1)Dynamic Attribute Association
1.00
AC-17(1)Monitoring and Control
1.00
AC-2Account Management
1.00
AC-2(1)Automated System Account Management
1.00
AC-2(11)Usage Conditions
1.00
AC-2(3)Disable Accounts
1.00
AC-2(4)Automated Audit Actions
1.00
AC-24(1)Transmit Access Authorization Information
1.00
AC-25Reference Monitor
1.00

+90 more (top 10 by confidence shown)

NIST 800-1710 mappings

No source states a mapping between these directly.

Also reachable in 3 hops (2) derived by us, not asserted by any source

Each of these is a route we composed by chaining published mappings. No publisher states a relationship between the two endpoints.

3.4.1
1.00
3.4.2
1.00
CCI1 mapping
NIST CSF 2.00 mappings

No source states a mapping between these directly.

Also reachable in 3 hops (5) derived by us, not asserted by any source

Each of these is a route we composed by chaining published mappings. No publisher states a relationship between the two endpoints.

PR.PSPlatform Security
0.50

Who does this work

10 NICE work roles and 9 EC-Council certifications.

This is an inference across published mappings, not a single claim by anyone. This check maps to a control, which maps to a Cybersecurity Framework outcome, which NIST assigns to the work roles below. EC-Council separately maps its certifications to those same roles.

A certification prepares someone for a role. It is not evidence that a holder is qualified, and neither NIST nor EC-Council has stated that any certification here addresses this check.

Work-role assignments published by NIST (NICE Framework Components 2.2.0 and the CSF 2.0 OLIR crosswalk). Certification mappings published by EC-Council.

Details

Check Text (C-207181r604135_chk)

Review the PE router configuration to verify that split horizon is enabled. If it is disabled, this is a finding. Note: In a ring VPLS, split horizon is disabled so that a PE router can forward a packet received from one pseudowire to another pseudowire. To prevent the consequential loop, at least one span in the ring would not have a pseudowire for any given VPLS instance.

Fix Text (F-7442r382632_fix)

Enable split horizon on all PE routers deploying VPLS in a full-mesh configuration.