Contingency Plan Testing
Contingency Planning
Control Statement
Test the contingency plan for the system {{ insert: param, cp-04_odp.01 }} using the following tests to determine the effectiveness of the plan and the readiness to execute the plan: {{ insert: param, cp-4_prm_2 }}. Review the contingency plan test results; and Initiate corrective actions, if needed.
Discussion
Methods for testing contingency plans to determine the effectiveness of the plans and identify potential weaknesses include checklists, walk-through and tabletop exercises, simulations (parallel or full interrupt), and comprehensive exercises. Organizations conduct testing based on the requirements in contingency plans and include a determination of the effects on organizational operations, assets, and individuals due to contingency operations. Organizations have flexibility and discretion in the breadth, depth, and timelines of corrective actions.
- Framework
- NIST SP 800-53 Rev 5
- Family
- Contingency Planning
- Baselines
- low, moderate, high
Related Frameworks
7 paths across 2 frameworks
Related Frameworks
SCF2 mappings
CCI5 mappings
- DISA · 2025-01-23 · disa_cci_list · equivalent
- DISA · 2025-01-23 · disa_cci_list · equivalent
- DISA · 2025-01-23 · disa_cci_list · equivalent
- DISA · 2025-01-23 · disa_cci_list · equivalent
- DISA · 2025-01-23 · disa_cci_list · equivalent